Works
Within the scope of the İzmit Plajyolu wastewater treatment plant revision construction, the dismantling of the old marine outfalls, the supply and welding of 300 meters of new Ø1400 mm, Ø1200 mm, and Ø1000 mm HDPE PE100 PN6 pipes with flanges and adapters, the manufacturing and installation of blocks, the production and installation of 3,000 cement-based mounting pads, and 3,800 m³ of marine excavation for the construction of the marine outfall.