Works
Within the scope of the repair of the Mardin Kızıltepe (BeyazSu) drinking water intake structure; the project includes dredging the interior of the caisson-type intake structure measuring 25 x 6 meters, performing concrete repairs, reinforcement via underwater welding, support with cemented mounting pads, installation of the intake chamber, leveling by spreading granular material, and conducting testing operations.