Works
Construction of a 750 m long, Ø1600 mm HDPE seawater intake pipeline, including 5,000 m³ of subsea excavation and seabed levelling, towing the pipeline to its final offshore alignment and controlled sinking, installation of the seawater intake structure at a depth of 27 m below sea level, completion of 3,500 m³ of backfilling works, and harbour deepening operations.