Marmara Diving : Marine outfall, Dredging, Salvage, Offshore contractor
  • Facebook
  • Linkedin
  • Twitter
  • Yahoo
  • YouTube
  • RSS
  • Home
  • About Us
    • Vision and Core Values
    • SHE – Q Policy
    • Company Profile
    • Certificates
    • Diving Equipment
    • References
    • Contact Us
  • Services
    • Marine Construction
      • Marine Outfall
    • Offshore Diving
    • Underwater Inspection
    • Marine Salvage
    • Water & Sewage Infrastucture Construction
      • PE 100 Pipes
  • Projects
    • PDF Catalogue
  • Home
  • References

About Us

  • Vision and Core Values
  • SHE – Q Policy
  • Company Profile
  • Certificates
  • Diving Equipment
  • References
  • Contact Us

References

Employer           : Aksa Akrilik Kimya Sanayi A.Ş.
Subcontractor   : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Scope of Work   : 690 meters in length and Ø 1600 mm in diameter HDPE PN4 seawater intake pipeline
construction scope of the work; Sea 5000 m³ excavation and levelling done, instead of at
sea to be sunk off the pipeline, Installation water intake pit at -27 meters deep,
3500 m ³ back filling and deepen the port covers of the works.
logo
Employer            : İski Genel Müdürlüğü
Contractor          : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Scope of Work   : İski (Omerli) Raw Water Pump Station Suction Hopper and Water Intake Structure
Cleanliness covered lake located within the 8 x 8 meter and 15 meters in depth
sprinklers structure be cleaned the mussel’s sack lake with tooth transportation,
land-based 6 x 32 meters length , 23 meters deep the water intake chamber
made of mussel cleaning tank with pressure pump relocation work shown is taken out.
logo
Employer           : Nuh Çimento Sanayi A.Ş.
Contractor          : Ats Arıtma
Subcontractor    : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Scope of Work   : Nuh Cement Port facilities under-15 meters of Pier 3 pcs Ø 800 mm from the seawater inlet system installation
logo
Employer           : Fırat Plastik Kauçuk San. ve Tic. A.Ş.
Subcontractor    : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Scope of Work   : Enka Teknik Libya produced for Project 6 pcs 500 meter in length Ø 1400 mm
diameter HDPE PN6 pipes to be launched, making side by side installation
of safety measures taken at sea for 10 days and delivery works
logo
Employer           : Öztaş İnşaat, İnşaat Malzemeleri Tic. A.Ş.
Subcontractor    : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Scope of Work   : Mardin, Kiziltepe (white water) drinking water water infiltrated a structure repair on
scope; Caisson made as 25 x 6 metre water infiltrated a structure inside of the
screening, concrete repair of underwater welding support needs to be done,
should be supported with a pillow and get the water reservoir of cemented Assembly
installation, granular material and leveling test covers work by pouring.
logo
Employer           : İsu Genel Müdürlüğü (İnşaat Yatırım Dairesi Başkanlığı)
Contractor          : Hidrotek Arıtma İnşaat Sanayi ve Tic. Ltd. Şti.
Subcontractor    : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Scope of Work   : İsu Plajyolu belongs to maneuver a wastewater treatment plant room from 2 pcs
Ø 1000 mm steel tube cut CRP sea discharge of output under the blind dates;
Filled with water to the level of the sea room to maneuver. Steel pipes by the
underwater cutting over 1500 mm long pipe into the pump discharge lines are
imported, made cleaning with. Attaching pipes pipe blindly apparatus creaters.
Out of the water in the pump room to maneuver through the pressing room is completed
logo
Employer           : Aksa Akrilik Kimya Sanayi A.Ş.
Subcontractor    : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Scope of Work   : Ø 1600 mm above sea Intake line old water inlet chamber is disassembled,
the new entry reservoir site preparation, water intake high performance, the
new chamber -27 m the erection of the pipe and container support assembly
by performing commissioning and testing works.
logo
Employer           : İsu Genel Müdürlüğü (İnşaat Yatırım Daire Başkanlığı)
Contractor          : Hidrotek Arıtma İnşaat Sanayi ve Ticaret Ltd. Şti.
Subcontractor    : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Scope of Work   : İzmit Plajyolu wastewater treatment plant construction of the revision in the
context of former marine discharges were dismantled, 300 meter new
Ø 1400 mm, Ø 1200 mm, Ø 1000 mm diameter PE100 HDPE PN6 pipe flange
and adapter supply, fabrication and erection of boiling, block, 3000 pieces
cemented mounting pad production and Assembly, 3800 m³ dredging of the
sea with sea discharge construction work.
logo
Employer           : Nuh Çimento Sanayi A.Ş.
Contractor          : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Scope of Work   : 5 years period of maintenance and repair of Sea Water Intake line
logo
Employer           : IHI İzmit Köprü Şantiyeleri
Contractor          : TYK İnşaat San. ve Tic. Ltd. Şti.
Subcontractor    : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Scope of Work   : Construction site infrastructure in the 2200 meters Ø 75 mm HDPE PN16
wastewater pipeline supply and laying of 2,000 meters, Ø 75 mm HDPE PN16
clean water pipeline supplying and laying waste water tank, pump, valve and
clean water valve supply and connections made commissioning is.
logo
Employer           : İski Genel Müdürlüğü
Contractor          : Mpe Engeneering
Subcontractor    : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Scope of Work   : İski Affiliated İlkent, Büyük Çekmece, Heybeli island, Silivri Central,
Kınalı island, Büyük island, Burgaz island including Ø 315 – Ø 1600 mm
diameter in the range of total 7pcs. 9177 meter and -60 meter deep sea
discharge underwater video inspection (cctv), to obtain the coordinates and
reporting . Burgaz island pipe plug of sea discharge, the clamp assembly.
Heybeli island marine outfall located at -42 meter with congestion caused
by mounting flange also be brought into line operational works.
logo
Employer           : Su Ürünleri Merkez Araştırma Enstitüsü
Contractor          : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Subcontractor    : –
Scope of Work   : Phase-1 Water -55 meters deep water intake line can not be taken underwater
controls are made on land lines from the pool into the water by pressing
with 37 kW pump blockage detection and -45 meters underwater to make
the controls of water intake line.
Phase-2 Flange fracture detected – 55 meters
deep water intake line to be drilled, block the removal of the welding process
is done again laying, -55 m, -45 m and -25 m in the intake structures to be cleaned,
which is open flange consolidation, broken clamp hit points and all lines
tested and commissioning is brought into operation.
logo
Employer           : Boskalis Offshore Marine B.V.
Contractor          : Marmara Dalgıçlık İnşaat Sanayi ve Tic. Ltd. Şti.
Subcontractor    : –
Scope of Work   : Taklift 6 Hull and water suction line Inspection, 3 Pieces sea chest cover removed
to be given to the deck, the interior of the water jet cleaning to be done with the lids is closing.
logo

Completed Projects
• Aksa Cooling Water Intake Pipeline
• İSKİ Ömerli Raw Water Intake Cleaning
• Nuh Çimento Seawater intake structure
• Fırat Enka Teknik Libya Pipe project
• Mardin Water Intake Structure Repair
• Plajyolu Pipe Plug of Sea Discharge
• Aksa seawater intake pit changing
• Plajyolu Deep Sea Marine Outfall
• IHI Infrastructure construction
• Boskalis Taklift 6 Hull Ispection
• Central Fisheries Research Institute Seawater Intake Line Repair

Marmara Diving Corporate

Mission;Marine Construction industry with honest and positive work projects that are under commitment, appropriate direction to increase customer satisfaction by working to create an institutional structure.

Vision;Finish each project, by meeting the expectations of customers and employees Marmara Diving to aim to be a global company.